CityAR
Posted
Oct 4, 2026
Oct 27, 2026
Brookland - WWTF Headworks Improvements RFP
The project will consist of the installation of a second screening unit
Description: P/N: 1415827 | QTY: 1 - GF10000PW floating, AC powered circulation equipment with chemical injection assembly, high-torque direct-drive brushless DC motor, digital control system converts AC to low voltage DC, four SCADA outputs. Requires 120VAC/60Hz 15 amp service SHALL INCLUDE THE FOLLOWING: P/N: 101748 | QTY: 1 - PW Hose Assembly, 36" X 20', Includes Flanges, Clamps & Chain P/N: 101750 | QTY: 1 - PW Hose Assembly, 36" X 10', Includes Flanges, Clamps & Chain P/N: 102050 | QTY: 1 - Potable Water Dual Tether Anchor Kit P/N: 10014018 | QTY: 82 FEET - Stainless Steel Tether Cable, P/N: 1415382 | QTY: 50 FEET - Electrical Cable, P/N: 4401175 | Crate for Large GridBee Mixer.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Los Angeles.
Adjacent opportunities open for bidding right now.
CityAR
Posted
Oct 4, 2026
Oct 27, 2026
The project will consist of the installation of a second screening unit
FederalVA
Posted
Oct 22, 2026
Nov 23, 2026
The solicitation seeks one unit of reservoir assembly, NSN 4320014606232, with vendor part number 97499 901-044-021-107. DLA Aviation at Philadelphia identifies the contract as firm fixed price. SAM.gov lists offers due November 23, 2026, at 3:30 PM EST, while the linked NECO page lists 4:30 PM Eastern Time.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.