Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
5,000 SF, painting; 300 LF, base; 220 SF, acoustical tile; 140 LF, hss 10x10x3/8 - 2hr fireproofing; 20.5 LF, w12x26 -2 hr fireproofing; 1 ea, precast panel; 3,100 SF, gypsum board patching; 1,200 SF, mineral wool insulation; 300 SF, fiberglass insulaton; 1,200 SF, rotunda insulation; see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Needed repairs to the West Haven Emergency Generators (deficiencies noted during Major Preventive Maintenance Service/Inspections) Description of services: Vendor to provide repairs to West Haven Generators to restore reliability to the below listed units and deficiencies.
Posted Date
Dec 16, 2025
Due Date
Dec 31, 2025
Release: Dec 16, 2025
Close: Dec 31, 2025
Provide Needed repairs to the West Haven Emergency Generators (deficiencies noted during Major Preventive Maintenance Service/Inspections) Description of services: Vendor to provide repairs to West Haven Generators to restore reliability to the below listed units and deficiencies.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish labor and materials for lsu tiger stadium 2026 concrete maintenance and repairs for north and south level 3 and 4, east and west level 2.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Furnish labor and materials for lsu tiger stadium 2026 concrete maintenance and repairs for north and south level 3 and 4, east and west level 2.
AvailableThe purpose of this document is to provide general and specific information for Solid Waste Shed No. 2 Repairs. The Shed No. 2 Repairs scope of work includes: Existing asphalt pavement removal and new concrete pavement installation; Repair of existing curb guards; Shed No. 2 push pit repairs.
Posted Date
Dec 18, 2025
Due Date
Jan 26, 2026
Release: Dec 18, 2025
Close: Jan 26, 2026
The purpose of this document is to provide general and specific information for Solid Waste Shed No. 2 Repairs. The Shed No. 2 Repairs scope of work includes: Existing asphalt pavement removal and new concrete pavement installation; Repair of existing curb guards; Shed No. 2 push pit repairs.
AvailableProvide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the station 24 erosion repairs. Includes furnishing all labor, materials, tools, equipment and services necessary to complete the removal of miscellaneous site elements, earthwork, site clearing, storm-water drainage, segmental retaining walls, fencing, concrete paving, and landscaping.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the station 24 erosion repairs. Includes furnishing all labor, materials, tools, equipment and services necessary to complete the removal of miscellaneous site elements, earthwork, site clearing, storm-water drainage, segmental retaining walls, fencing, concrete paving, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →