Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Milwaukee Metropolitan Sewerage District
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Lee County
SE force main improvements
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
Lee County
Close: Dec 2, 2025
SE force main improvements
AvailableCosta Mesa Sanitary District
Work consists of constructing new sewer gravity main, a new manhole, and some work. Work includes, remove and dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities; repair pavement, roads, sod, and all other areas affected by construction operations and restore them to original condition or to minimum condition specified; remove spatter, grease, stains, fingerprints, dust, labels, tags, packing materials and other foreign items or substances from interior and exterior surfaces, equipment, signs and lettering; repair, patch and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish; remove paint, clean and restore all equipment and material nameplates, labels and other identification markings; wash and shine glazing and polished surfaces; clean all floors, slabs, pavements, and ground surfaces; maintain cleaning until acceptance and occupation by the district.
Posted Date
Nov 10, 2025
Due Date
Jan 7, 2026
Release: Nov 10, 2025
Costa Mesa Sanitary District
Close: Jan 7, 2026
Work consists of constructing new sewer gravity main, a new manhole, and some work. Work includes, remove and dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities; repair pavement, roads, sod, and all other areas affected by construction operations and restore them to original condition or to minimum condition specified; remove spatter, grease, stains, fingerprints, dust, labels, tags, packing materials and other foreign items or substances from interior and exterior surfaces, equipment, signs and lettering; repair, patch and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish; remove paint, clean and restore all equipment and material nameplates, labels and other identification markings; wash and shine glazing and polished surfaces; clean all floors, slabs, pavements, and ground surfaces; maintain cleaning until acceptance and occupation by the district.
AvailableLondon Utility Commission
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
Posted Date
-
Due Date
Nov 25, 2025
Release: -
London Utility Commission
Close: Nov 25, 2025
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
City of Naperville
Water main improvements.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
City of Naperville
Close: Dec 12, 2025
Water main improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis