Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
SE force main improvements
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Posted Date
Nov 19, 2025
Due Date
Jan 21, 2026
Release: Nov 19, 2025
Close: Jan 21, 2026
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
AvailableProvide force main replacement services. Replacing approx. 4,770 LF of existing 16" force main, provide all necessary bypass pumping, MOT, restoration of disturbed areas, and pavement repair.
Posted Date
Dec 29, 2025
Due Date
Feb 2, 2026
Release: Dec 29, 2025
Close: Feb 2, 2026
Provide force main replacement services. Replacing approx. 4,770 LF of existing 16" force main, provide all necessary bypass pumping, MOT, restoration of disturbed areas, and pavement repair.
AvailableProject to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
Posted Date
Dec 25, 2025
Due Date
Jan 22, 2026
Release: Dec 25, 2025
Close: Jan 22, 2026
Project to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →