Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fort Lauderdale is soliciting bids to replace approximately 4,770 linear feet of existing 16-inch force main, including bypass pumping, maintenance of traffic, restoration of disturbed areas, and pavement repair. The work extends from SE 12th Street and Cordova Road to SE 17th Street and Eisenhower Boulevard in Fort Lauderdale, Florida. This is a sealed IFB requiring a 5 percent bid bond and is currently open with a posted Q&A schedule and closing date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of highlands force main flushing inlet replacement.
Posted Date
Dec 19, 2025
Due Date
Jan 2, 2026
Release: Dec 19, 2025
Close: Jan 2, 2026
Project consists of highlands force main flushing inlet replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
AvailableHampton Roads Sanitation District (HRSD) is soliciting bids for replacement of the Section W force main associated with the North Shore Road Pump Station. The project replaces approximately 2,642 linear feet of existing 10-inch cast iron force main with a new alignment and appurtenances, including main line and branch valves, with sections planned as 8-inch ductile iron in narrow residential corridors (e.g., Shirland Avenue and a crossing of W Little Creek Road). The bid closes on January 29, 2026 at 2:00 PM local time, with construction anticipated to begin in early 2026 and continue into 2027.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Hampton Roads Sanitation District (HRSD) is soliciting bids for replacement of the Section W force main associated with the North Shore Road Pump Station. The project replaces approximately 2,642 linear feet of existing 10-inch cast iron force main with a new alignment and appurtenances, including main line and branch valves, with sections planned as 8-inch ductile iron in narrow residential corridors (e.g., Shirland Avenue and a crossing of W Little Creek Road). The bid closes on January 29, 2026 at 2:00 PM local time, with construction anticipated to begin in early 2026 and continue into 2027.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;