Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Miami Beach seeks construction services to rehabilitate the subaqueous portion of a 10‑inch ductile iron force main serving Star Island. The work includes locating the existing pipe, initial assessment, cleaning, Cured‑in‑Place‑Pipe (CIPP) lining, and post‑installation assessment along Bridge Road near the MacArthur Causeway. Electronic responses are submitted via BidNet Direct, with a site visit and pre‑bid on January 26, 2026, and bids due February 26, 2026 at 3:00 PM ET.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Miami Beach is seeking professional services for force main subaqueous lining repair.
Posted Date
-
Due Date
Feb 26, 2026
Close: Feb 26, 2026
The City of Miami Beach is seeking professional services for force main subaqueous lining repair.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Posted Date
Nov 19, 2025
Due Date
Jan 21, 2026
Release: Nov 19, 2025
Close: Jan 21, 2026
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
AvailableProvide construction services for armoring of the (42") force main crossing, installation of approx 625 LF of armoring over the 42" subaqueous ductile iron pipe (DIP) force main.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Provide construction services for armoring of the (42") force main crossing, installation of approx 625 LF of armoring over the 42" subaqueous ductile iron pipe (DIP) force main.
AvailableWork includes approx 4,250 LF of 8" sewer force main.
Posted Date
Jan 3, 2026
Due Date
Feb 11, 2026
Release: Jan 3, 2026
Close: Feb 11, 2026
Work includes approx 4,250 LF of 8" sewer force main.