Woodhaven-Brownstown School District
School DistrictMI
Posted
Sep 14, 2026
Sep 29, 2026
WHS Locker Room Mechanical Improvements Project - WBSD-260000002627-1 (Request for Proposals)
Work includes locker room mechanical improvements.
Description: Work includes IPD locker room improvements includes protect flooring/walkways; prep and protect surrounding area around shower; prep existing tile walls w/ready to use bond promoting primer; remove tiles from curb and prep area; provide concrete cutting/grinding to accommodate new tile to drain as neccessary; 70 SF of remove shower tile floor and ground floor w/vacuum w/filter prep for floor tile. See attached file.
City · OH, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Woodhaven-Brownstown School District
School DistrictMI
Posted
Sep 14, 2026
Sep 29, 2026
Work includes locker room mechanical improvements.
FederalAE
Posted
Sep 3, 2026
Sep 21, 2026
The 48th Operations Group at RAF Lakenheath seeks refurbishment of pilot locker rooms in Building 1355 to improve capacity and facility safety. The work includes removing 80 existing lockers, furnishing and installing 130 new lockers with helmet sections, repairing damaged vinyl flooring, and providing closeout documentation and an Operations & Maintenance Manual. The solicitation is an open federal procurement requiring compliance with applicable health and safety requirements, including risk assessments, method statements, and contractor-designation obligations.
University Of Central Missouri
Higher EducationMO
Posted
Sep 14, 2026
Sep 29, 2026
Construction of new volleyball and wrestling team locker room.
CityCT
Posted
Sep 11, 2026
Oct 15, 2026
Work includes selective demolition; removal of existing lockers and concrete locker bases; construction of new partitions, toilet rooms, and showers; relocation of doors, card readers, and the washer and dryer; installation of new plumbing fixtures, toilet partitions, accessories, ceilings, lighting, ventilation, flooring, wall tile, counters, and finishes; and all associated plumbing, mechanical, electrical, fire-protection, access-control, patching, and restoration work required to provide complete and operational locker room facilities. New lockers will be furnished and installed by others; however, the contractor shall provide the required electrical power and coordinate with the locker supplier.
Decision makers connected to this RFP from City of Independence.