CityWI
-
Closes
Jan 28, 2027
Sauk Creek Greenway Phase 3
Sauk creek greenway phase 3.
Description: Project consists of constructing a multi-use path and replacement of the traffic signal. Work includes approx 22,500 SF concrete sidewalk; 400 SF concrete ADA ramp; 2,300 SF concrete driveway.
City · MO, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityWI
-
Closes
Jan 28, 2027
Sauk creek greenway phase 3.
Ohio Department of Transportation
State AgencyOH
Jul 1, 2027
Closes
Nov 30, 2027
Resurface and repair stretches of the Little Beaver Creek Greenway Trail, including drainage, fence, and rock channel protection.
CityWI
-
Closes
Dec 17, 2026
Provide dredging.
CityNC
May 12, 2026
Closes
Sep 29, 2026
Work includes structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures, structures #102 and #103 consists of replacing the existing timber decking with frp, structure #17 consists of replacing the existing timber structure with timber glu-lams and timber decking, structure #17 consists of replacing the existing timber structure with steel framing and frp decking.
Decision makers connected to this RFP from City of Springfield.