Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sauk creek greenway phase 3 & 4.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of approximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control for the Morgan Creek Greenway Phase 1.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Construction of approximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control for the Morgan Creek Greenway Phase 1.
Premium
Access the largest public sector contact database
Town of Carrboro solicits CEI and construction contract administration services for Morgan Creek Greenway Phase 1 (approx. 1,723 linear feet pedestrian greenway, two pedestrian bridges ~100' and ~55', retaining walls and stream buffers). Requires NCDOT prequalification for Work Codes 233 and 195, NC-registered Professional Engineers for responsible charge, $1,000,000 professional liability insurance, 2-year cost-plus contract; submit a Letter of Interest (LOI) with completed RS-2 forms, 15-page LOI limit.
Posted Date
Dec 7, 2025
Due Date
Jan 2, 2026
Release: Dec 7, 2025
Close: Jan 2, 2026
Town of Carrboro solicits CEI and construction contract administration services for Morgan Creek Greenway Phase 1 (approx. 1,723 linear feet pedestrian greenway, two pedestrian bridges ~100' and ~55', retaining walls and stream buffers). Requires NCDOT prequalification for Work Codes 233 and 195, NC-registered Professional Engineers for responsible charge, $1,000,000 professional liability insurance, 2-year cost-plus contract; submit a Letter of Interest (LOI) with completed RS-2 forms, 15-page LOI limit.
AvailableRestore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
Posted Date
Dec 10, 2025
Due Date
Dec 23, 2025
Release: Dec 10, 2025
Close: Dec 23, 2025
Restore a total of 6,380 LF of Parkway Creek located along the Capital Area Greenbelt, 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.
AvailableApproximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control. See attached file for full scope.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Approximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis