Posted
Aug 27, 2026
Oct 13, 2026
I-10 Gateway Corridor Initiative
Project consists of but is not limited to planting various tree specimens along the i-10 corridor.
Description: Construction includes variable speed limit signs, directional boring, solar assemblies for speed limit signs, ITS device integration, and miscellaneous construction.
StateAgency · PA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Pennsylvania Department of Transportation.
These related opportunities are still open for bidding.
Posted
Aug 27, 2026
Oct 13, 2026
Project consists of but is not limited to planting various tree specimens along the i-10 corridor.
CityCA
Posted
Oct 8, 2026
Nov 4, 2026
Work includes 6,175 LF install striping; 1,255 LF 12" striping (thermoplastic limit line); 25,540 sf install ladder crosswalk; 840 SF pavement markings (thermoplastic); 755 SF green pavement markings (bike lanes); 2,500 LF remove and install curb marking; 6 EA remove existing sign; 2,187 LF install detail 9 per caltrans standard plan a20a; 229 LF install detail 37b per caltrans standard plan a20b; 250 LF install 6" white line (not from a caltrans detail). See outside link.
CityIL
Posted
Apr 23, 2026
Oct 20, 2026
2 ea paint existing lighting or irrigation, lighting, receptacle or traffic signal cabinet; 6 ea signal head, polycarbonat e, led, 3- section, bracket mounted; 6 ea signal head, polycarbonat e, led, 3- section, bracket mounted; 11 ea signal head, polycarbonat e, led, 3- section, mast arm mounted.
Utah Department of Transportation
State AgencyUT
Posted
Sep 19, 2026
Oct 15, 2026
Work includes 12 EA reconstruct catch basin - lower; 12 EA reconstruct catch basin - raise (rapid set); 30 LF remove guardrail; 0.10 acre clearing and grubbing (plan quantity); 10 CY roadway excavation (plan quantity); 60 TN untreated base course (plan quantity); 24,400 LF untreated base course - shouldering; 1,280 CY asphalt pavement soft spot repair - contingency item; 960 CY granular borrow soft spot repair - contingency item; 12,600 TN highly-modified asphalt mix - 1/2 inch; 1,900 LF conventional continuous longitudinal rumble strip - asphalt.