Rauchtown Bridge
Posted
Oct 27, 2026
Dec 10, 2026
The project replaces an existing Concrete Encased Steel I-Beam Bridge with a 24'-0" X 8'-6" Precast RC Box Culvert. Associated work includes roadway relocation, asphalt paving, piping, guide rail installation, and miscellaneous construction. This is a bridge construction procurement, not a grant program.




