CityPA
Posted
-
Oct 27, 2026
Morrisville Borough - RFP: Pennsylvania Avenue & Trenton Avenue Signal Improvements
Consulting engineering services for the modernization of traffic signal equipment at Pennsylvania Avenue and Trenton Avenue.
Description: This Request for Proposal is for milling and resurfacing North Avenue, including minor curb, sidewalk, driveway, and drainage improvements, along with ADA ramp reconstruction and stormwater inlet improvements.
City · NJ, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The agenda proposed awarding Boswell Engineering a professional services contract to prepare construction plans and specifications for Improvements to North Avenue.
PROPOSED CONSENT AGENDA All items listed on the consent agenda are routine and non-controversial and will be approved by a motion, a second and a roll call vote. CA-1 Payment of Claims CA-2 Approving Firefighter's Association Application for Membership for Jong H. Seo, Fire Company #2, and Approving Firefighter Auxiliary Applications for Nicola Attanasio,…
Borough of Fort Lee Regular Session Meeting
Board meeting · Aug 14, 2025
R-6 Inserting Items of Revenue and Appropriation in the Amount of $266,070.00 from NJDOT, North Avenue Improvements
Borough of Fort Lee Regular Session Meeting
Board meeting · Aug 14, 2025
RFP published
Proposals due (7 days left)
Decision makers connected to this RFP from Borough of Fort Lee.
Adjacent opportunities open for bidding right now.
CityPA
Posted
-
Oct 27, 2026
Consulting engineering services for the modernization of traffic signal equipment at Pennsylvania Avenue and Trenton Avenue.
CityNY
Posted
Sep 30, 2026
Oct 28, 2026
Includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in the specifications including, but not necessarily limited to the following: mill and overlay the existing pavement with spot full depth repairs; closed drainage system replacement and improvements; installation of curb bumpouts, including a rapid-flashing beacon pedestrian crossing; installation of new ADA ramps; reconfiguration of the Parkside Ave and Linden Ave intersection including full replacement of the existing traffic signal and related infrastructure; construction/extension of a structural wall; landscaping improvements; fire hydrant replacements and relocations; installation of signs and pavement markings; all survey operations required to complete the work; maintenance and Protection of Traffic including maintaining existing traffic signals.
CityNY
Posted
Sep 30, 2026
Oct 28, 2026
Includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in the specifications including, but not necessarily limited to the following: mill and overlay the existing pavement with spot full depth repairs; closed drainage system replacement and improvements; installation of curb bumpouts, including a rapid-flashing beacon pedestrian crossing; installation of new ADA ramps; reconfiguration of the Parkside Ave and Linden Ave intersection including full replacement of the existing traffic signal and related infrastructure; construction/extension of a structural wall; landscaping improvements; fire hydrant replacements and relocations; installation of signs and pavement markings; all survey operations required to complete the work; maintenance and Protection of Traffic including maintaining existing traffic signals.
Posted
Oct 14, 2026
Oct 28, 2026
Project consists of two (2) base bids that include improvements base bid 'A' consists of improvements from station 1+00 to station 34+25, and base bid 'B' consists of improvements from station 34+25 to 72+23. Improvements include milling, paving, hma pavement repair, installation of compliant curb pieces, sidewalk repair, curb repair, driveway apron repair, installation of ada compliant curb ramps, traffic striping and markings, as well as any other improvements depicted within the construction plans. The improvements also include paving within the new jersey transit ROW And requires coordination with new jersey transit. All work on this contract must be completed within ninety (90) calendar days from issuance of a notice to proceed.