Special DistrictTX
Posted
Aug 19, 2026
Oct 6, 2026
Halls Bayou Greenway Trail Segment HA03D
The work includes but is not limited to: concrete pedestrian trail, earthwork, stormwater culverts, swppp, lime stabilization, sod and hydroseed.
Description: Plan and profile of proposed Northend Greenway (Brookside Segment) infrastructure improvements; including grading, geometric control, utility installations, sanitary sewer replacement, erosion and sediment controls, wall placement, and stormwater management adjustments.
City · VA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Harrisonburg.
Adjacent opportunities open for bidding right now.
Special DistrictTX
Posted
Aug 19, 2026
Oct 6, 2026
The work includes but is not limited to: concrete pedestrian trail, earthwork, stormwater culverts, swppp, lime stabilization, sod and hydroseed.
FederalVA
Posted
Sep 23, 2025
Sep 23, 2026
Vane segment, compre., NSN: 2840-01-619-8983NZ.
CityWI
Posted
-
Dec 17, 2026
Provide dredging.
CityNC
Posted
May 12, 2026
Sep 29, 2026
Work includes structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures, structures #102 and #103 consists of replacing the existing timber decking with frp, structure #17 consists of replacing the existing timber structure with timber glu-lams and timber decking, structure #17 consists of replacing the existing timber structure with steel framing and frp decking.