School DistrictCA
Posted
Sep 23, 2026
Oct 27, 2026
RIO HONDO HVAC REPLACEMENT PROJECT
El Monte City School District is soliciting electronic bids to remove the existing variable refrigerant flow HVAC system at Rio Hondo School in Arcadia and install 33 owner-furnished 5-ton split-system heat pumps across campus buildings. The work includes independent indoor fan-coil and outdoor condensing units for occupied classrooms and offices, along with associated ductwork, air distribution, controls, and thermostats. Attendance at the mandatory pre-bid conference and site visit is required, and bidders must submit a bid bond and meet California contractor-licensing and public-works registration requirements.
