Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of replacement of 480v switchgear and subsystem, extension of distribution systems, reprograming of the SCADA and fire alarm systems as necessary.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Service 480V switchgear replacement.
Posted Date
Nov 6, 2025
Due Date
Jan 30, 2026
Release: Nov 6, 2025
Close: Jan 30, 2026
Service 480V switchgear replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing the existing main electrical switchboard.
Posted Date
Jan 8, 2026
Due Date
Feb 19, 2026
Release: Jan 8, 2026
Close: Feb 19, 2026
Replacing the existing main electrical switchboard.
AvailableProject scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Feb 5, 2026
Release: Nov 10, 2025
Close: Feb 5, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
AvailablePower switchgear. Provide the necessary guidelines and special conditions for designing, manufacturing, testing, installation, and required documentation for the power switchgear. The proposed equipment will be replacing (2) existing outdoor circuit breakers, (1) existing outdoor tie breaker, and existing associated material.
Posted Date
Jan 2, 2026
Due Date
Jan 27, 2026
Release: Jan 2, 2026
Close: Jan 27, 2026
Power switchgear. Provide the necessary guidelines and special conditions for designing, manufacturing, testing, installation, and required documentation for the power switchgear. The proposed equipment will be replacing (2) existing outdoor circuit breakers, (1) existing outdoor tie breaker, and existing associated material.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →