Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Power switchgear. Provide the necessary guidelines and special conditions for designing, manufacturing, testing, installation, and required documentation for the power switchgear. The proposed equipment will be replacing (2) existing outdoor circuit breakers, (1) existing outdoor tie breaker, and existing associated material.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project includes the following: Demolition of existing switchgear at substation BBC and EBBC; running new underground conduit from spare breakers to junction boxes; installing and testing new switchgear equipment and related accessories; phasing and minimizing power outages during construction with temporary power solutions.
Posted Date
Dec 23, 2025
Due Date
Jan 29, 2026
Release: Dec 23, 2025
Close: Jan 29, 2026
This project includes the following: Demolition of existing switchgear at substation BBC and EBBC; running new underground conduit from spare breakers to junction boxes; installing and testing new switchgear equipment and related accessories; phasing and minimizing power outages during construction with temporary power solutions.
AvailablePurchase of Power Control Enclosure and Switchgear to support Silicon Valley Power, the City's electric utility.
Posted Date
Dec 16, 2025
Due Date
Feb 12, 2026
Release: Dec 16, 2025
Close: Feb 12, 2026
Purchase of Power Control Enclosure and Switchgear to support Silicon Valley Power, the City's electric utility.
AvailableSoliciting bids for 15kV and 38kV Switchgear and related field engineering services for assembly.
Posted Date
Dec 9, 2025
Due Date
Feb 13, 2026
Release: Dec 9, 2025
Close: Feb 13, 2026
Soliciting bids for 15kV and 38kV Switchgear and related field engineering services for assembly.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis