Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Pendleton
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pendleton Utility Office
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Pendleton Utility Office
Close:
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Work includes site grading, detention/retention areas, and erosion control measures. Installation of substation security fencing. Erection of 69kV and 15kV steel bus structures, bus work, and associated equipment. Erection of overhead static wires and supporting structures for substation lightning protection. Installation of all above and below grade substation grounding and foundations. Installation of AC and DC control and power cables. Installation of the secondary containment systems around the new and existing station transformer. Installation of all junction boxes, conduit, and raceway (above and below grade). Installation of 15kV feeder exit circuits to designated locations outside the substation yard fence. Receive, unload, move, store and install all owner furnished materials specified or indicated.
AvailablePendleton Utility Office
Provide two (2) new 15 kV Outdoor Reclosers rated 1200 continuous amps, four (4) new 15 kV Outdoor Reclosers rated 600 continuous amps, and providing miscellaneous materials.
Posted Date
Nov 8, 2025
Due Date
Dec 11, 2025
Release: Nov 8, 2025
Pendleton Utility Office
Close: Dec 11, 2025
Provide two (2) new 15 kV Outdoor Reclosers rated 1200 continuous amps, four (4) new 15 kV Outdoor Reclosers rated 600 continuous amps, and providing miscellaneous materials.
AvailableVillage of Winnetka
Provision of substation transformer.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Village of Winnetka
Close: Dec 10, 2025
Provision of substation transformer.
AvailableVillage of Winnetka
Provision of substation transformer.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Village of Winnetka
Close: Dec 10, 2025
Provision of substation transformer.