Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sacramento Area Sewer District
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Tulsa
Service 480V Switchgear Replacement.
Posted Date
Nov 6, 2025
Due Date
Dec 8, 2025
Release: Nov 6, 2025
U.S. Army Engineer District Tulsa
Close: Dec 8, 2025
Service 480V Switchgear Replacement.
AvailableCity of Leavenworth
Work includes : demolition of existing switchgear and installation of a prefabricated electrical equipment enclosure housing a new 15 kv main switchgear and associated equipment on a concrete equipment pad.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
City of Leavenworth
Close: Dec 3, 2025
Work includes : demolition of existing switchgear and installation of a prefabricated electrical equipment enclosure housing a new 15 kv main switchgear and associated equipment on a concrete equipment pad.
AvailableMilwaukee Metropolitan Sewerage District
Purchase one medium voltage metal-enclosed switchgear and one switchgear bay.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
Milwaukee Metropolitan Sewerage District
Close: Nov 20, 2025
Purchase one medium voltage metal-enclosed switchgear and one switchgear bay.
AvailableTown of Ayden
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
Posted Date
-
Due Date
Dec 16, 2025
Town of Ayden
Close: Dec 16, 2025
2023 Swift Creek Sanitary Sewer Contract No. 8 - Sanitary Sewer Outfall Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis