Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Service 480V switchgear replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of replacement of 480v switchgear and subsystem, extension of distribution systems, reprograming of the SCADA and fire alarm systems as necessary.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Work consists of replacement of 480v switchgear and subsystem, extension of distribution systems, reprograming of the SCADA and fire alarm systems as necessary.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
The U.S. Army Corps of Engineers (USACE) - Tulsa District issued Sources Sought A038461 for a turnkey Design-Build contract to replace the existing built-up roof on the Ft. Gibson Powerhouse with a new 2-ply Modified Bituminous Membrane roofing system, including new roof drainage and optional guard rails and roof ladders. The contractor is expected to provide all design, investigation, materials, labor, equipment, and management required to complete the project. The opportunity was posted Dec 9, 2025 and is due Jan 9, 2026; the source listed is SAM.gov and the PIEE solicitation module link is provided for vendor access.
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
Posted Date
Nov 10, 2025
Due Date
Feb 5, 2026
Release: Nov 10, 2025
Close: Feb 5, 2026
Project scope involves removing the existing switchgear, supplying and installing a new switchgear system, and ensuring compatibility with existing transfer control equipment. This will improve reliability of the electrical infrastructure. Key requirements include compatibility with the upgraded echowater distributed control system (dcs) transfer controls and addressing issues related to maintaining power to critical equipment at the outfall.
AvailableThe City of Long Beach (NY) is soliciting professional engineering services to replace the incoming 2000A 277/480V electrical switchgear at the Ice Arena, including an existing-conditions survey, preparation of bidding and construction design documents, and construction administration. The scope includes survey and written report, detailed design drawings/specifications for bidding and permitting, and construction administration (shop drawing reviews, field visits, bid evaluation assistance); the design period is Feb 1–Mar 27, 2026 and construction is anticipated May–Oct 2026. Firms must demonstrate relevant experience and submit three copies of their proposal; the posted estimated value range is $200,000–$500,000 and the response deadline is Jan 23, 2026.
Posted Date
Dec 30, 2025
Due Date
Jan 23, 2026
Release: Dec 30, 2025
Close: Jan 23, 2026
The City of Long Beach (NY) is soliciting professional engineering services to replace the incoming 2000A 277/480V electrical switchgear at the Ice Arena, including an existing-conditions survey, preparation of bidding and construction design documents, and construction administration. The scope includes survey and written report, detailed design drawings/specifications for bidding and permitting, and construction administration (shop drawing reviews, field visits, bid evaluation assistance); the design period is Feb 1–Mar 27, 2026 and construction is anticipated May–Oct 2026. Firms must demonstrate relevant experience and submit three copies of their proposal; the posted estimated value range is $200,000–$500,000 and the response deadline is Jan 23, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →