CityKS
Posted
Nov 24, 2026
Dec 11, 2026
Pawnee Prairie Park Trail Improvements RFP
Work includes mobilization, existing 10' wide gravel path, removed and stockpiled, site restoration and seeding, concrete flume - 30' long, installed, concrete flume - 40' long, installed, construction signage and barriers, 3/8" crushed angular gravel path 10' wide, installed 4,940 LF, existing 10' wide gravel path, scrapped and stockpiled 1,785 LF, existing 6' wide gravel path, scrapped and stockpiled 570 LF, existing gravel path (4"), dismantled and stockpiled 480 SF, concrete path (4"), installed 480 SF.
