CityNC
Posted
Aug 26, 2026
Sep 23, 2026
Creeper Trail Park Lower Loop Area of Big Horse Creek RFP
Lower loop area of Big Horse Creek damage incurred during Hurricane Helene. All demolition debris must be disposed of at a permitted landfill.
Description: Project includes the construction of a 10-foot-wide concrete regional trail extending from West Temple Park to Prairie View Drive, as well as a 6-foot-wide concrete trail segment within West Temple Park. The work also provides for two rest stations equipped with appropriate site amenities to support trail users.
City · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityNC
Posted
Aug 26, 2026
Sep 23, 2026
Lower loop area of Big Horse Creek damage incurred during Hurricane Helene. All demolition debris must be disposed of at a permitted landfill.
CountyVA
Posted
Aug 20, 2026
Sep 17, 2026
Park improvements, generally consists of a 13.5-acre site with infrastructure and marine elements, 6 parking spaces with a portable restroom facility, 0.2 mile of improvements to an existing nature trail, pier and kayak launch.
CityTX
Posted
Aug 4, 2026
Sep 14, 2026
This project consists of constructing approx. 3372 LF of 10' wide concrete trail, including rehabilitation/stabilization of existing concrete channel, pedestrian railing, and subsidiary work.
CityMO
Posted
Sep 2, 2026
Oct 1, 2026
The City of Neosho is soliciting bids for Phase 4 of the Morse Park Trail Lighting project, extending lighting from E. Spring Street to the Lampo Building. The project is part of a multi-year effort to replace existing solar lighting with a more cost-efficient and reliable electrical system. The solicitation is open, was published on September 2, 2026, and closes October 1, 2026, at 2:00 PM local time.