Galveston County Municipal Utility Dist. No. 73
Special DistrictTX
Jul 14, 2026
Closes
Aug 11, 2026
Construction of the Storm Sewer & Paving Facilities to Serve Samara Hobbs Road Extension
Storm sewer and paving facilities.
Description: Storm sewer extension work includes construction of a new relief storm sewer line. Work generally includes asphalt removal/replace, erosion control, earthwork, storm sewer improvements, creek outfall protection including gabion baskets and gabion mattress, aggregate surfacing, and parking stall re-striping in select areas. Removals, Replacements, and Eartwork: 2 EA Tree Removals (28" dia. and 14" dia.); 548 SY remove/replace existing asphalt, 6"; 241 SY remove/replace 6" aggregate surfacing (gravel drive); Miscellaneous grading at creek outfall at pipe end section installation. Storm Sewer: 814 LF 30" RCP, Class III (w/Type A aggregate backfill beneath pavement). 3 EA storm manhole and 1 EA area inlet. 1 EA connection to existing 9th Street storm sewer manhole. 1 EA concrete headwall with end section at creek outfall. Gabion baskets and mattresses supporting pipe end section at creek outfall.
City · OK, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Sulphur.
Adjacent opportunities open for bidding right now.
Galveston County Municipal Utility Dist. No. 73
Special DistrictTX
Jul 14, 2026
Closes
Aug 11, 2026
Storm sewer and paving facilities.
CityDE
-
Closes
Aug 20, 2026
The Town of Clayton, Delaware is soliciting sealed bids for the Storm Sewer Repair project, which consists of repairing approximately 3,530 linear feet of existing storm sewer mains ranging from 8-inch to 42-inch diameter round pipe and 34-inch by 53-inch elliptical pipe using open-cut trench replacement and Cured-In-Place-Pipe (CIPP) construction methods. The work includes traffic control, milling, hot-mix trench and roadway paving, hot-mix overlay, and restoration of all surfaces disturbed by construction. A non-mandatory pre-bid meeting will be held on August 3, 2026 at 10:00 a.m. at Clayton Town Hall, and bids will be opened publicly on August 20, 2026 at 2:00 p.m. local time.
Special DistrictNE
Aug 5, 2026
Closes
Aug 26, 2026
Approx 119 SY remove and replace 9" concrete pavement; 72 LF saw cut - full depth; 364 LF construct 24" storm sewer; 153 LF construct 30" storm sewer; etc.
CityDE
-
Closes
Aug 20, 2026
The Town of Clayton, Delaware is soliciting sealed bids for the Storm Sewer Repair project, which consists of repairing approximately 3,530 linear feet of existing storm sewer mains ranging from 8-inch to 42-inch diameter round pipe and 34-inch by 53-inch elliptical pipe using open-cut trench replacement and Cured-In-Place-Pipe (CIPP) construction methods. The work includes traffic control, milling, hot-mix trench and roadway paving, hot-mix overlay, and restoration of all surfaces disturbed by construction. A non-mandatory pre-bid meeting will be held on August 3, 2026 at 10:00 a.m. at Clayton Town Hall, and bids will be opened publicly on August 20, 2026 at 2:00 p.m. local time.