CityFL
Posted
-
Sep 25, 2026
Old Cutler Road Shared-Use Path Pavement Repairs
Project consists of asphalt pavement repairs and pavement marking restoration along the existing Old Cutler Road Shared-Use Path from SW 67th Avenue to SW 111th Street.
Description: This project consists of constructing a new shared-use path.
City · NC, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Charlotte.
These related opportunities are still open for bidding.
CityFL
Posted
-
Sep 25, 2026
Project consists of asphalt pavement repairs and pavement marking restoration along the existing Old Cutler Road Shared-Use Path from SW 67th Avenue to SW 111th Street.
Massachusetts Department of Transportation
State AgencyMA
Posted
-
Sep 22, 2026
Work on this project includes construction of a shared use path.
CityKS
Posted
-
Oct 2, 2026
The City of De Soto is requesting Statements of Qualifications from qualified civil engineering firms for professional engineering, project management, and owner’s representative services for the Sunflower Road Shared-Use Path Missing Link project. The project consists of approximately 0.5 miles, or 2,610 feet, of 10-foot-wide asphalt shared-use path along the east side of Sunflower Road between 91st Street and 87th Street. The selected consultant will advance the existing design through Kansas Department of Transportation project development, final approval, bidding, and construction; the posting is an active professional-services RFQ, not a grant application.
CountyMD
Posted
Jul 15, 2026
Oct 16, 2026
Work consist of developing a shared-use path for bicycle and pedestrian.