CityLA
Posted
Aug 12, 2026
Sep 8, 2026
Elevated Water Storage Tank Rehabilitation RFP
Elevated water storage tank rehabilitation.
Description: This project consists of; 1.0 MG composite, elevated, water storage tank, along with all associated electrical, lighting, SCADA and controls as well as all site preparation and improvements, site drainage, yard piping, security fencing, and access drive, as indicated on the construction plans.
City · AR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityLA
Posted
Aug 12, 2026
Sep 8, 2026
Elevated water storage tank rehabilitation.
Posted
Aug 19, 2026
Sep 10, 2026
Provide a new 210' tall, nominal 519,000 GAL composite elevated water tank.
CityTX
Posted
Aug 16, 2026
Sep 17, 2026
Rehabilitation of the 1. 0 mg keller smithfield elevated storage tank.
CityTX
Posted
-
Sep 17, 2026
The City of Parker, Texas is soliciting construction bids for the Parker Ranch 1-MG Elevated Storage Tank H.W.L. 800 Feet, a project intended to increase local water-storage capacity. The scope includes an AWWA D107 composite 1.0-million-gallon tank, site work, piping, and appurtenances, with construction at the designated Parker, Texas site. The solicitation requires compliance with the Build America, Buy America Act under the Bipartisan Infrastructure Law and is a construction procurement rather than a grant program.
Decision makers connected to this RFP from City of Pea Ridge.