CityLA
Aug 12, 2026
Closes
Sep 8, 2026
Elevated Water Storage Tank Rehabilitation RFP
Elevated water storage tank rehabilitation.
Description: Rehabilitation of the 1. 0 mg keller smithfield elevated storage tank.
City · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityLA
Aug 12, 2026
Closes
Sep 8, 2026
Elevated water storage tank rehabilitation.
CityTX
Aug 6, 2026
Closes
Aug 27, 2026
Work consists of elevated storage tank rehabilitation, includes repair and coating of 1.0 mg tank.
CityRI
Jul 29, 2026
Closes
Sep 4, 2026
Prepare and paint the bottom two rings of the steel tank, and repair the concrete base. The water tank rehabilitation will involve proper preparation, applying a coat of two-part epoxy to the lower two rings, and applying a topcoat of urethane. Efforts must be made to match the existing color as close as possible.
CityNM
Jul 24, 2026
Closes
Aug 27, 2026
Work includes 60 MH repair welding (if required); 4 GAL pit filling and surfacing (if required); 100 MH interior chipping and/or grinding (if required); 28 EA roof and roof knuckle stiffener replacement (if required); 1 LS obstruction light replacement (if required); 3 EA expansion joints (if selected); 1 LS erosion and sediment control (esc).
Procurement and program contacts connected to City of Keller.