CityTX
Posted
Aug 16, 2026
Sep 17, 2026
Rehabilitation of the 1.0 MG Keller Smithfield Elevated Storage Tank
Rehabilitation of the 1. 0 mg keller smithfield elevated storage tank.
Description: The City of Parker, Texas is soliciting construction bids for the Parker Ranch 1-MG Elevated Storage Tank H.W.L. 800 Feet, a project intended to increase local water-storage capacity. The scope includes an AWWA D107 composite 1.0-million-gallon tank, site work, piping, and appurtenances, with construction at the designated Parker, Texas site. The solicitation requires compliance with the Build America, Buy America Act under the Bipartisan Infrastructure Law and is a construction procurement rather than a grant program.
City · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Parker.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Aug 16, 2026
Sep 17, 2026
Rehabilitation of the 1. 0 mg keller smithfield elevated storage tank.
CityAR
Posted
Aug 23, 2026
Sep 15, 2026
This project consists of; 1.0 MG composite, elevated, water storage tank, along with all associated electrical, lighting, SCADA and controls as well as all site preparation and improvements, site drainage, yard piping, security fencing, and access drive, as indicated on the construction plans.
CityTX
Posted
Aug 31, 2026
Sep 15, 2026
Procurement of an elevated storage tank for the first pressure plane.
Mustang Special Utility District
Special DistrictTX
Posted
Aug 21, 2026
Sep 15, 2026
Construction of a 1.5 million gallon waterspheroid elevated storage tank.