CityNJ
Posted
Nov 16, 2026
Dec 15, 2026
2027 Maintenance Contact (the "Project") ERI Project No. 44000 21 RFP
Maintenance of the Borough of Palmyra Sewer Treatment Plant and Collection System for 2027.
Description: The City of Fort Smith is soliciting a contractor to provide recurring grounds maintenance and custodial services for recreational access areas at Lee Creek Reservoir and associated tailwater facilities, including trash and debris removal, restroom cleaning and disinfecting, sewage holding tank pumping and disposal, mowing, trimming, edging, trail cleanup, sweeping, and replenishment of consumable supplies. Work is defined by unit and monthly frequencies in the technical specifications and is to be performed under a multi-year contract period that is to commence January 1, 2027 and extend through December 31, 2031. The contractor must furnish all labor, materials, equipment and water, maintain required insurance and licenses, provide disposal documentation for sewage, and comply with safety, addenda, and bid security requirements in the contract documents.
City · AR, US
Adjacent opportunities open for bidding right now.
CityNJ
Posted
Nov 16, 2026
Dec 15, 2026
Maintenance of the Borough of Palmyra Sewer Treatment Plant and Collection System for 2027.
Regional Transportation Commission of Washoe County
Special DistrictNV
Posted
Nov 12, 2026
Dec 17, 2026
Work include full roadway width milling and paving with isolated patching, striping replacement and updates, signage replacement and updates, and concrete improvements to include pedestrian ramps and driveways. Plumas street will include milling and paving travel lanes only, striping replacement and upgrades, signage replacement and upgrades.
CityCA
Posted
Nov 6, 2026
Dec 3, 2026
Replace the existing timber steel and timber framed roof structure. removal of the existing wood and membrane roof, steel superstructure, and precast concrete columns/footings; installation of new concrete sheer walls, concrete footings, and various concrete repairs; final design and installation of a complete aluminum roof system with ladders, walk pads, vents, hatches, and flashing; installation of new membrane liner; installation of solar-powered mixing equipment and control updates; reservoir cleaning and disinfection; testing, commissioning, and site restoration. The Project also includes minor concrete repairs to the exterior of Reservoir No. 1, located at the same site.
CityWA
Posted
Nov 5, 2026
Dec 3, 2026
Furnishing and installing a seismic control valve and associated work at the City of Auburn’s Reservoir 2.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Fort Smith.