CountyNV
Posted
-
Sep 16, 2026
Sidehill Drive Pedestrian Improvements
Work inlcudes construction of pedestrian improvements along approximately 1,200 LF mobilization and demobilization; construction traffic control; removal of existing composite pavement, asphalt concrete dike, portland cement concrete pavement, and drop inlet; and construction of pcc sidewalk, type 1 pcc curb and gutter, pcc driveways and driveway conforms, a pedestrian ramp, and a cast-in-place type 4r catch basin. Additional work includes adjusting manholes to finished grade, constructing hma driveway conforms, performing contingent permanent pavement patching, and completing all associated grading, restoration, and incidental work. See attached file.