Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include removal and replacement of existing roofing system above the kitchen, cafeteria, room 201-204 & auxiliary gym.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking proposals for the reconstruction of the Great Harbor Ramp.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Seeking proposals for the reconstruction of the Great Harbor Ramp.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for the reconstruction of the Great Harbor Ramp.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Seeking proposals for the reconstruction of the Great Harbor Ramp.
AvailableWork includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
AvailableWork includes site work. See outside link.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Close: Jan 6, 2026
Work includes site work. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →