Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Weslaco ISD seeks proposals for roofing replacement and repair at Mary Hoge Middle School. The project includes roof replacement and repairs as detailed in the architect/engineer's drawings and specifications. Proposals must be submitted electronically through IONWAVE/EUNA. A bid bond or cashier's check of 5% of the total project cost is required.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Weslaco ISD seeks proposals for roofing replacement and repair at Mary Hoge Middle School. The project includes roof replacement and repairs as detailed in the architect/engineer's drawings and specifications. Proposals must be submitted electronically through IONWAVE/EUNA. A bid bond or cashier's check of 5% of the total project cost is required.
Premium
Access the largest public sector contact database
Senior high school roofing.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Close: Dec 15, 2025
Senior high school roofing.
AvailableWeslaco ISD seeks proposals for roofing replacement and repair at Mary Hoge Middle School. The project includes roof replacement and repairs as detailed in the architect/engineer's drawings and specifications. Proposals must be submitted electronically through IONWAVE/EUNA. A bid bond or cashier's check of 5% of the total project cost is required.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Weslaco ISD seeks proposals for roofing replacement and repair at Mary Hoge Middle School. The project includes roof replacement and repairs as detailed in the architect/engineer's drawings and specifications. Proposals must be submitted electronically through IONWAVE/EUNA. A bid bond or cashier's check of 5% of the total project cost is required.
AvailableRobert F Kennedy (RFK) Pre-Kindergarten, vacant site, 4.9276 acres of improved land. Flood Zone C, an area of minimal flooding, Map No. 4802140048F “A-2”, H – Apartment District with Historic Overlay “C-3” – Commercial with Historic Overlay. This property includes: 214,647 SF / 4.9276 acres. Property classification: Vacant parcel/site.
Posted Date
Dec 15, 2023
Due Date
Dec 31, 2025
Release: Dec 15, 2023
Close: Dec 31, 2025
Robert F Kennedy (RFK) Pre-Kindergarten, vacant site, 4.9276 acres of improved land. Flood Zone C, an area of minimal flooding, Map No. 4802140048F “A-2”, H – Apartment District with Historic Overlay “C-3” – Commercial with Historic Overlay. This property includes: 214,647 SF / 4.9276 acres. Property classification: Vacant parcel/site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis