Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Senior high school roofing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
Work includes complete removal and replacement of roofing systems across two existing campus buildings, totaling approx 131,386 SF (building 1 = 104,400 SF, building 2 = 26,986 SF), demolition of the existing modified bitumen system down to the concrete deck, roof deck inspection, installation of new insulation and a 2-ply modified bitumen roofing system, and updates to rooftop components, install new roof insulation to achieve a minimum R-20.
Premium
Access the largest public sector contact database
Work includes roofing replacement at the sports complex concessions stand and associated work.
Posted Date
Nov 18, 2025
Due Date
Jan 13, 2026
Release: Nov 18, 2025
Close: Jan 13, 2026
Work includes roofing replacement at the sports complex concessions stand and associated work.
AvailableThe project consists of roofing replacement at the sports complex concessions stand at Marengo Community High School, including associated work as indicated in the drawings. Bids are due January 13, 2026 at 1:00 PM CST, with a pre‑bid meeting on December 9, 2025.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
The project consists of roofing replacement at the sports complex concessions stand at Marengo Community High School, including associated work as indicated in the drawings. Bids are due January 13, 2026 at 1:00 PM CST, with a pre‑bid meeting on December 9, 2025.
AvailableWork consist of modified bitumen roofing.
Posted Date
Dec 10, 2025
Due Date
Dec 23, 2025
Release: Dec 10, 2025
Close: Dec 23, 2025
Work consist of modified bitumen roofing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis