CityTX
Aug 5, 2026
Closes
Aug 25, 2026
GP&L Greenville North Switch Station Steel
North Switch Station Steel.
Description: North Switch Station Steel.
City · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityTX
Aug 5, 2026
Closes
Aug 25, 2026
North Switch Station Steel.
CityFL
Aug 17, 2026
Closes
Sep 7, 2026
The City of Miramar is soliciting bids from qualified contractors to supply and install a single 800-amp, 480-volt, three-phase manual transfer switch with a weather-proof generator tap box at Fire Station 100. The work includes delivery, installation, wiring, grounding, functional testing, and submission of manuals, documentation, and warranty information. The invitation for bid opened on August 17, 2026, and responses are due September 7, 2026, at 2:00 p.m.
CityNE
Aug 13, 2026
Closes
Sep 10, 2026
Provide site preparation, concrete foundation installation and the complete erection of a new pre-engineered steel building for fire department.
Special DistrictMI
-
Closes
Aug 25, 2026
The Great Lakes Water Authority (GLWA) is soliciting construction services for the North Service Center Pumping Station Improvements (CIP #132016), a major rehabilitation project with an estimated construction cost of approximately $108,322,551. The work scope described in GLWA materials includes electrical upgrades (switchgear, variable drives, unit substation, excitation systems), mechanical replacements (multiple pumps and 2,500 hp motors), piping and valve replacements, and control system integrations to improve reliability and operational flexibility. GLWA manages solicitation and document distribution through its procurement channels and has planned multi-year design and construction activity for the project (design/assistance contracts and long completion horizon are reflected in GLWA board materials).
Procurement and program contacts connected to City of Garland.