Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will renovate portions of the first floor of general services building to realign office spaces with new team assignments. The scope of work includes the construction of walls and doors to create new individual office spaces. Also included is installation of new carpet, floor base, ceiling grid and new lighting in areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Work include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting. See attached file.
AvailableThe University of Missouri (Planning, Design & Construction) is soliciting construction/renovation services for the Jesse Hall first floor to create multimedia exhibits, add a new information desk, and install glass doors; the project is donor-funded with an estimated base cost of $2,100,000. The solicitation is listed as active on the university procurement site with a bid open date of 2026-04-06 and a bid due date of 2026-04-21.
Posted Date
Apr 6, 2026
Due Date
Apr 21, 2026
Release: Apr 6, 2026
Close: Apr 21, 2026
The University of Missouri (Planning, Design & Construction) is soliciting construction/renovation services for the Jesse Hall first floor to create multimedia exhibits, add a new information desk, and install glass doors; the project is donor-funded with an estimated base cost of $2,100,000. The solicitation is listed as active on the university procurement site with a bid open date of 2026-04-06 and a bid due date of 2026-04-21.
Provide county office building second floor offices renovation.
Posted Date
Jan 8, 2026
Due Date
Feb 11, 2026
Release: Jan 8, 2026
Close: Feb 11, 2026
Provide county office building second floor offices renovation.
AvailableLease of second floor premises of the ferry terminal building, with option to include first floor. Proposals to serve as Tenant for the First Floor, totaling approx. 14,973 leasable SF or a maximum occupancy of 1,032 persons.
Posted Date
Dec 8, 2025
Due Date
Feb 27, 2026
Release: Dec 8, 2025
Close: Feb 27, 2026
Lease of second floor premises of the ferry terminal building, with option to include first floor. Proposals to serve as Tenant for the First Floor, totaling approx. 14,973 leasable SF or a maximum occupancy of 1,032 persons.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis