Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Missouri (Planning, Design & Construction) is soliciting construction/renovation services for the Jesse Hall first floor to create multimedia exhibits, add a new information desk, and install glass doors; the project is donor-funded with an estimated base cost of $2,100,000. The solicitation is listed as active on the university procurement site with a bid open date of 2026-04-06 and a bid due date of 2026-04-21.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will renovate portions of the first floor of general services building to realign office spaces with new team assignments. The scope of work includes the construction of walls and doors to create new individual office spaces. Also included is installation of new carpet, floor base, ceiling grid and new lighting in areas.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Project will renovate portions of the first floor of general services building to realign office spaces with new team assignments. The scope of work includes the construction of walls and doors to create new individual office spaces. Also included is installation of new carpet, floor base, ceiling grid and new lighting in areas.
AvailableWork include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting. See attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Work include building renovation. Work covers approx 5,560 SF along the perimeter, that will be converted into new offices. The project includes select interior removals on the first floor of the federal building. Renovating the existing bathrooms, janitor's closet, and corridor. The mechanical fire protection, fire alarm, and electrical systems will be modified to suit the new interior layout. Additionally, installing new finishes such as ceilings, lighting, doors, frames, paint, ceramic tile, and carpeting. See attached file.
Renovations include updates to classrooms and study spaces, as well as modifications to the existing restrooms to comply with accessibility standards. Renovations will include selective demolition and replacement of flooring, walls, built-in lockers, paint, etc. Renovations to also include associated changes to engineering systems, electrical, mechanical, FA & FP to accommodate new areas.
Posted Date
Jan 15, 2026
Due Date
Feb 26, 2026
Release: Jan 15, 2026
Close: Feb 26, 2026
Renovations include updates to classrooms and study spaces, as well as modifications to the existing restrooms to comply with accessibility standards. Renovations will include selective demolition and replacement of flooring, walls, built-in lockers, paint, etc. Renovations to also include associated changes to engineering systems, electrical, mechanical, FA & FP to accommodate new areas.
Work includes memorial hall auditorium ceiling renovation.
Posted Date
Jan 16, 2026
Due Date
Feb 17, 2026
Release: Jan 16, 2026
Close: Feb 17, 2026
Work includes memorial hall auditorium ceiling renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →