CitySC
Jul 22, 2026
Closes
Aug 27, 2026
Green Acres & Quality Way Pump Station Upgrades RFP
Work includes approx 1 LS demolition; 1 LS grading; 1 LS bypass pumping; 100 SY Crushed Stone Paving; 400 LS Silt Fencing; 1 EA Pump Control Panel and Level Control system; 1 LS Piping, Valves, and Appurtenances; 1 LS Concrete Pads; 1 LS Chain Link Fencing & Gates; 1 LS Electrical; 1EA Wetwell Aeration System. Alternative: 1 LS Dual Auger Screen and Manhole; 10 LF of 15" Gravity Sewer (0-6 Foot Depth); 831 LF of 8" CIPP; 831 LF Pre & Post CCTV; 650 LF Line Cleaning (Standard); 30 VF Rehabilitate Ex. Manhole; 3 EA Replace Ex. Manhole Frame & Cover.