Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of San Mateo Parks Department seeks a qualified contractor to replace approximately 130 feet of failing 6-inch vitrified clay sewer line serving Flood Park Restroom A, including installing a new cleanout, reconnecting laterals, performing sewer testing, and restoring the site. The project work must meet a minimum slope of 1% and may use directional boring or open trench methods, with completion required within a 60-day project duration. Proposals are due February 12, 2026 at 5:00 PM Pacific Time and the procurement is a sealed bid RFP process.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
Available872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
AvailableWork includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Work includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
The project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
Posted Date
Dec 14, 2025
Due Date
Feb 3, 2026
Release: Dec 14, 2025
Close: Feb 3, 2026
The project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis