Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
872 LF sewer line replacement, 6 manholes, 13 service connections, & 520 LF surface repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes installation of new 4" HDPE sewer line by underground boring, connecting the existing line at the soccer fields to the existing line beyond the playground/shelter area. Bore approx 600 LF of 4" HDPE sewer pipe connecting the two locations. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sewer line replacement services.
Posted Date
Jan 8, 2026
Due Date
Feb 2, 2026
Release: Jan 8, 2026
Close: Feb 2, 2026
Sewer line replacement services.
AvailableWork consists of involves sewer line point repair main sewer line infrastructure. Work includes, 35 LF of replace 8" pipe w/ sdr-35; 20 LF of replace 8" pipe w/ sdr-35; 10 LF of replace 8" pipe w/ sdr-35 upstream from mh 36a750.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Work consists of involves sewer line point repair main sewer line infrastructure. Work includes, 35 LF of replace 8" pipe w/ sdr-35; 20 LF of replace 8" pipe w/ sdr-35; 10 LF of replace 8" pipe w/ sdr-35 upstream from mh 36a750.
AvailableThe County of San Mateo Parks Department seeks a qualified contractor to replace approximately 130 feet of failing 6-inch vitrified clay sewer line serving Flood Park Restroom A, including installing a new cleanout, reconnecting laterals, performing sewer testing, and restoring the site. The project work must meet a minimum slope of 1% and may use directional boring or open trench methods, with completion required within a 60-day project duration. Proposals are due February 12, 2026 at 5:00 PM Pacific Time and the procurement is a sealed bid RFP process.
Posted Date
Jan 22, 2026
Due Date
Feb 13, 2026
Release: Jan 22, 2026
Close: Feb 13, 2026
The County of San Mateo Parks Department seeks a qualified contractor to replace approximately 130 feet of failing 6-inch vitrified clay sewer line serving Flood Park Restroom A, including installing a new cleanout, reconnecting laterals, performing sewer testing, and restoring the site. The project work must meet a minimum slope of 1% and may use directional boring or open trench methods, with completion required within a 60-day project duration. Proposals are due February 12, 2026 at 5:00 PM Pacific Time and the procurement is a sealed bid RFP process.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →