CityMA
Posted
Aug 26, 2026
Sep 24, 2026
Firestation Renovations
Firestation renovations - interior glazing, resilient flooring, painting, plumbing, electrical.
Description: Firestation renovations - interior glazing, resilient flooring, painting, plumbing, electrical.
City · MA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMA
Posted
Aug 26, 2026
Sep 24, 2026
Firestation renovations - interior glazing, resilient flooring, painting, plumbing, electrical.
CityMS
Posted
Aug 19, 2026
Sep 17, 2026
The City of Greenville, Mississippi is soliciting proposals for the “BATHROOM RENOVATIONS” project at the Greenville Municipal Golf Clubhouse. Proposals are to be received at the City Clerk’s Office in City Hall, 340 Main Street, Greenville, Mississippi, by September 17, 2026 at 2:00 p.m. local time. The located notice does not identify a primary PDF, DOC, or PPT attachment and contains no grant-program language for this bid.
Wisconsin Department of Administration
State AgencyWI
Posted
Aug 6, 2026
Sep 15, 2026
In general, the work consists of: adding a wall in the existing Flight Planning room to create an Office and adding a wall in the Upper Lobby to create a Storage room. Remove a wall separating the existing Library from the Simulation Devices room to create a larger, single Fitness room. Mechanical work includes adding a VAV along with adding and removing ductwork to accommodate the room changes. Electrical work includes adding and removing devices including light fixtures. New finishes are planned for each of the rooms including removal and replacement of the lay-in ceiling. Lowering and slight adjustment of several fire sprinkler heads is required to accommodate the new layout.
CityCT
Posted
Aug 14, 2026
Sep 14, 2026
Perform improvements to the tee box areas of holes. The work includes tee box reconstruction, grading, fill placement, top-mix installation, finish grading, and installation of new turf. Remove existing tee surface material and prepare the existing tee complex and surrounding ground for reconstruction; raise the existing tee boxes approx., 18" above existing grade, with grading and tie-ins to surrounding ground as necessary; expand the rear tee box approx., 15' forward, generally in accordance with the attached concept drawing; expand the forward tee box by approx., 15' to the rear and 5' to the left. This is a planning estimate; final field dimensions shall be confirmed with RGC management before construction; grade new and existing slopes as appropriate to provide stable transitions, proper drainage, and a playable finished surface, while avoiding the need for new retaining walls where practical. See attached file.
Decision makers connected to this RFP from City of Lowell.