CityWI
Posted
Apr 22, 2026
Dec 16, 2026
McShane Lift Station Pipe and Structure Lining RFP
Work includes approx 100 LF 42" Sewer Pre Cleaning and Televising; 100 LF 42" Sewer CIPP installed by resin-impregnated; 100 LF 42" Sewer Post Televising; 15 EA Grouting 42" Pipe Joints; 2 EA Epoxy Coating 125 mil Thickness per Structure; 2 EA Substrate Coating 500mil Thickness per structure; 2 EA Grouting per Structure; 1 EA Bilco 72" x 30" Hatch w/ Fall Protection Grating; 1 EA Bilco 36" x 36" Fall Protection Grating; see outside link for more details.
