Open RFP

McShane Lift Station Pipe and Structure Lining RFP

Description: Work includes approx 100 LF 42" Sewer Pre Cleaning and Televising; 100 LF 42" Sewer CIPP installed by resin-impregnated; 100 LF 42" Sewer Post Televising; 15 EA Grouting 42" Pipe Joints; 2 EA Epoxy Coating 125 mil Thickness per Structure; 2 EA Substrate Coating 500mil Thickness per structure; 2 EA Grouting per Structure; 1 EA Bilco 72" x 30" Hatch w/ Fall Protection Grating; 1 EA Bilco 36" x 36" Fall Protection Grating; see outside link for more details.

Buyer
City of Muskego

City · WI, US

Released
Apr 22, 2026
Closes
Dec 16, 2026(24 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts