Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes install and electrify four (4) dual port level II chargers, and two (2) single port/level iii fast chargers for public use in city lot.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Santa Rosa is soliciting sealed bids (IFB 26-01) for installation and electrification of EV charging infrastructure in Parking Lot 10, including four dual-port Level II chargers and two single-port Level III fast chargers, plus necessary concrete/asphalt removal and replacement per engineered drawings. A mandatory onsite pre-bid meeting is scheduled and the procurement will be awarded as a lump-sum construction IFB; electronic responses are required. The solicitation is a standard public works procurement (not a grant) and is currently in the bidding stage.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Santa Rosa is soliciting sealed bids (IFB 26-01) for installation and electrification of EV charging infrastructure in Parking Lot 10, including four dual-port Level II chargers and two single-port Level III fast chargers, plus necessary concrete/asphalt removal and replacement per engineered drawings. A mandatory onsite pre-bid meeting is scheduled and the procurement will be awarded as a lump-sum construction IFB; electronic responses are required. The solicitation is a standard public works procurement (not a grant) and is currently in the bidding stage.
AvailableWork includes clearing, grubbing, removals & disposal 1 ls, construct pcc - curb (type a1-6) 621 lf, construct pcc - ribbon gutter 114 lf, construct pcc - ev foundation 24 32 cf, construct pcc - ev foundation 51 - 17 cf, construct pcc - light pole foundation 53 cf, construct pcc - bollard foundation 59 cf, construct hma (3.5" thick) 119 tn, traffic striping & markings 1 ls, landscape (boulders & dg) 1 ls, install bollards 10 ls, wheel stops 16 ea, install electrical, install lighting.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Work includes clearing, grubbing, removals & disposal 1 ls, construct pcc - curb (type a1-6) 621 lf, construct pcc - ribbon gutter 114 lf, construct pcc - ev foundation 24 32 cf, construct pcc - ev foundation 51 - 17 cf, construct pcc - light pole foundation 53 cf, construct pcc - bollard foundation 59 cf, construct hma (3.5" thick) 119 tn, traffic striping & markings 1 ls, landscape (boulders & dg) 1 ls, install bollards 10 ls, wheel stops 16 ea, install electrical, install lighting.
AvailableThe City of Carlsbad is soliciting bids for the construction and installation of new electric vehicle (EV) charging stations and related parking lot improvements at the State Street Parking Lot. The scope includes installation of city-supplied switchboard, transformer, panels, ChargePoint EV chargers, foundations, conductors, communications cabling, and all electrical gear per contract drawings; bidders must hold California A, B or C-10 contractor licenses and include ChargePoint manufacturer training/certifications with their submission. The estimated bid value is roughly $193,000 and the solicitation was posted on 2026-01-13 with a bid/proposal due date of 2026-03-05 (open/active as of 2026-01-14).
Posted Date
Jan 13, 2026
Due Date
Mar 5, 2026
Release: Jan 13, 2026
Close: Mar 5, 2026
The City of Carlsbad is soliciting bids for the construction and installation of new electric vehicle (EV) charging stations and related parking lot improvements at the State Street Parking Lot. The scope includes installation of city-supplied switchboard, transformer, panels, ChargePoint EV chargers, foundations, conductors, communications cabling, and all electrical gear per contract drawings; bidders must hold California A, B or C-10 contractor licenses and include ChargePoint manufacturer training/certifications with their submission. The estimated bid value is roughly $193,000 and the solicitation was posted on 2026-01-13 with a bid/proposal due date of 2026-03-05 (open/active as of 2026-01-14).
AvailableInstall new asphalt parking lot with 16 stalls with EV Charging Station, ADA parking stalls and new exterior lighting, ADA concrete walkways, tubular steel fencing and removal of existing matting at play structure and replace with a pour in place system.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Install new asphalt parking lot with 16 stalls with EV Charging Station, ADA parking stalls and new exterior lighting, ADA concrete walkways, tubular steel fencing and removal of existing matting at play structure and replace with a pour in place system.