CountyFL
Posted
Oct 1, 2026
Nov 6, 2026
Enterprise East Infrastructure Improvements
Construct ±0.443 miles of rural section asphalt roadway with side ditches, conversion of an existing borrow pit to a storm water management facility, new storm sewer collection system, new water main and sanitary sewer force main, traffic signs and traffic paint/markings. Work includes 1 LS mobilization, 1 LS erosion control, 10.48 AC clearing & grubbing, 26,497 CY regular excavation, 50 SY 1" depth milling, 734 TN 1.5" asphaltic pavement, 1 EA storm inlet manholes, 72 SY 6" concrete pavement, 4,900 LF fencing, 10 EA single swing gate, 34,134 SY performance turf, 2 EA 8" gate valve, 4 EA fire hydrant, 291 LF 4" PVC sanitary sewer pipe.
