CityFL
Aug 9, 2026
Closes
Sep 10, 2026
Emergency Operations Center, Standby Generator Phase 2: Parallel UPS Installation
Work includes furnishing, installation, and commissioning of a new 400 kw diesel generator system to replace an existing unit within a dedicated generator room. The contractor will be responsible for safely removing the existing generator and associated transfer switch for the city's reuse, providing the new generator, all required switchgear, wiring, and conduit to properly connect various components to the existing power distribution at the facility to ensure reliable, uninterrupted backup power for these mission-critical services in case of a power outage.