Retrieving RFP details
Release
Close
City of Fernley
The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction. Work generally include dewatering, sludge drying, removal and disposal, removal of existing HDPE lining system, minor grading, subgrade preparation, and installation of new HDPE lining system for both ponds. Additional ancillary items including but not limited to life buoy stands, anchor trenches, pipe boots, ballast tubes, and escape ladders are also proposed. See outside link.
Jacksonville Jaguars
Bid Packages will include the following: IFC #4A scopes: misc. metals, metal wall panels, roofing, spray applied fireproofing & insulation, doors/frames/hardware, curtain wall systems, interior glazing & mirrors, drywall partitions & ceilings, rough carpentry, firestopping, joint sealants, wall & door protection. IFC #4B scopes: ornamental metals, architectural woodwork, code & wayfinding signage, food service equipment, LED displays, ADA lifts, video production. IFC #4C scopes: ceramic tile, carpeting, paint & wall coverings, toilet partitions, operable partitions, toilet & building assessories, fire extinguishers & cabinets, lockers. IFC #4D scopes: gate/entry canopies, athletic equipment, site preparation (phase 2), asphalt paving, hardscape, playing surfaces, site improvements, landscape & irrigation.
New Hanover County
Work consist of construction of landfill cells 12b & 13 and the relining of the county's leachate lagoon, site preparation, grading, placement of the liner system, placement of the soil cover systems, associated hauling and perimeter roads, stormwater management systems, leachate collection piping, sump and pumps, electrical and control panels, and rain tarp (bid alternate) with county coordination.
City of Evansville
Work includes replacement of the existing grating over the influent channels in the east wwtp headworks building and other related items pertinent and incidental thereto, including the furnishing of all labor, materials, supplies, equipment, work and services, ready for satisfactory and continuous operation, in accordance with the drawings and specifications. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary.
Release
Oct 29, 2025
Close
Nov 19, 2025