Closing soon

DQ 27-004 Cooling Tower Replacement

Description: Pikes Peak State College is seeking a contractor to replace two deteriorated cooling tower cells and their associated concrete support pads at the Center for Healthcare Education & Simulation in Colorado Springs. The work includes removal and disposal of the existing cells, installation of new gravity-flow return controlled cooling tower cells and support pads, piping and electrical reconnections, insulation, permitting, inspections, startup verification, and site cleanup. The anticipated performance period begins December 7, 2026, and ends January 8, 2027, with a minimum one-year warranty required.

Buyer
Pikes Peak State College

HigherEducation · CO, US

Released
-
Closes
Sep 15, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts