School DistrictIL
Posted
Oct 14, 2026
Nov 10, 2026
King ES - Domestic Water Pump RFP
Domestic water pump and piping replacement. Demolish and remove existing booster pump, Keckley pressure-control valve assembly, associated sensing/control piping, and associated check valve. Modify roughly 35' of the existing domestic water piping as required to accommodate the new booster pump system. See attached file.
