CountyFL
Posted
Sep 1, 2026
Sep 29, 2026
Design and Construction of Power Distribution within the County Solid Waste Disposal Complex (Request for Qualification)
DESIGN BUILD. To engage a qualified design-build team to develop and implement a resilient, multi-source microgrid system at the Integrated Solid Waste Management Disposal Complex. The microgrid will integrate power from the existing Waste-To-Energy (WTE) facility, a new floating solar arrays, and electric utility services to provide electricity to county facilities, enhance reliability, operational continuity, and sustainability across the site.