Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN/BUILD of a restroom building near the city park boat ramp.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design/Build-Seeking qualifications for design build services to design and construct a new maintenance of way and office building. The project work tasks shall include, but not be limited to, site development, utility hook-ups, building design and construction to modify main office building and associated components, building design/demolition and construction of new maintenance of way building, mechanical, electrical, plumbing, utility installation and relocation.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design/Build-Seeking qualifications for design build services to design and construct a new maintenance of way and office building. The project work tasks shall include, but not be limited to, site development, utility hook-ups, building design and construction to modify main office building and associated components, building design/demolition and construction of new maintenance of way building, mechanical, electrical, plumbing, utility installation and relocation.
AvailableDesign and construction of a new restroom building at Hill Street Park for the City of North Myrtle Beach.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Design and construction of a new restroom building at Hill Street Park for the City of North Myrtle Beach.
AvailableThe City of North Myrtle Beach is soliciting competitive bids for the Design & Construction for a new Restroom Building located in the Hill Street Park located at 2346 Hill Street in the City of North Myrtle Beach, SC 29582.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The City of North Myrtle Beach is soliciting competitive bids for the Design & Construction for a new Restroom Building located in the Hill Street Park located at 2346 Hill Street in the City of North Myrtle Beach, SC 29582.
AvailableDESIGN-BUILD: Renovating twelve (12) bathrooms. The work will consist of painting upgrades, new doors, hardware, and frames, providing ADA compliant facilities, new ADA compliant sinks, urinals, and lavatories. New hand dryers, upgraded lighting, new heaters for antifreeze applications only, install new exhaust fans that properly ventilate the spaces, new janitor’s closet, new tile flooring, new wall tiles, new floor drains, back draft dampers and grille covers and new hose bibs outside of each restroom.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
DESIGN-BUILD: Renovating twelve (12) bathrooms. The work will consist of painting upgrades, new doors, hardware, and frames, providing ADA compliant facilities, new ADA compliant sinks, urinals, and lavatories. New hand dryers, upgraded lighting, new heaters for antifreeze applications only, install new exhaust fans that properly ventilate the spaces, new janitor’s closet, new tile flooring, new wall tiles, new floor drains, back draft dampers and grille covers and new hose bibs outside of each restroom.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →