CityNY
Posted
-
Oct 20, 2026
Town of Alexander Water District No.7 Phase 1A
Work includes : 5,020 LF furnish and install DR-18 PVC water main complete; 27,400 LF furnish and install 12" diameter DR-18 PVC water main complete; 210 directional drilling 8" diameter HDPE DR-11 water main complete; 110 boring with 8" diameter DR-18 PVC water main carrier with 24" diameter steel casing pipe complete; see outside link.
