Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of two new pedestrian crosswalk improvements, furnishing and installing a rectangular rapid flashing beacon (RRFB), removal and replacement of concrete sidewalks with detectable warnings, removal of an existing culvert pipe, and furnishing and installing a new culvert pipe with mitered end sections, furnishing and installing two streetlights,furnishing and installing signs, and placement of thermoplastic pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
Posted Date
Dec 4, 2025
Due Date
Feb 5, 2026
Release: Dec 4, 2025
Close: Feb 5, 2026
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
AvailableProviding professional consulting services to the City's Mobility Division for the Systemic Crosswalk Improvements.
Posted Date
Jan 29, 2026
Due Date
Feb 27, 2026
Release: Jan 29, 2026
Close: Feb 27, 2026
Providing professional consulting services to the City's Mobility Division for the Systemic Crosswalk Improvements.
AvailableWork includes 460 SY subgrade treatment, type ic, 337 CY structure backfill, type 2, 853 CY compacted aggregate, no. 53, 325 ton hma for structure installation, type c full depth pavement, 918 Ton milling, asphalt, 1 1/2 IN, 76 Ton hma surface, type c, 9. 5 mm, 1 Ton asphalt for tack coat, 102 SY sidewalk, concrete, 4 IN, 1,939 SY curb ramp, concrete, 4 IN, 205 SY detectable warning surfaces, 3,409 SY raised pedestrian crossing. See attached file.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Work includes 460 SY subgrade treatment, type ic, 337 CY structure backfill, type 2, 853 CY compacted aggregate, no. 53, 325 ton hma for structure installation, type c full depth pavement, 918 Ton milling, asphalt, 1 1/2 IN, 76 Ton hma surface, type c, 9. 5 mm, 1 Ton asphalt for tack coat, 102 SY sidewalk, concrete, 4 IN, 1,939 SY curb ramp, concrete, 4 IN, 205 SY detectable warning surfaces, 3,409 SY raised pedestrian crossing. See attached file.
This Invitation to Bid is for the Powerline Road Crosswalk Lighting Project.
Posted Date
Jan 23, 2026
Due Date
Mar 3, 2026
Release: Jan 23, 2026
Close: Mar 3, 2026
This Invitation to Bid is for the Powerline Road Crosswalk Lighting Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis